Skip to main content
Skip to main navigation menu
Skip to site footer
Open Menu
About
About the Journal
Submissions
Privacy Statement
Contact
Current
Archives
Editorial Team
Reviewer
Review Process
Article Template
Publication Ethics
Focus and Scope
Author Guidelines
Indexing
Search
Register
Login
Home
/
Archives
/
Vol. 4 No. 01 (2024): Edisi Januari 2024
Vol. 4 No. 01 (2024): Edisi Januari 2024
DOI:
https://doi.org/10.33752/reaktip.v4i01
Published:
2024-09-15
Articles
PENERAPAN LINEAR SCHEDULING METHOD (LSM) PADA PENINGKATAN JALAN RAYA CANGKINGRANDU
Bagus Subachtiar, Totok Yulianto, Meriana Wahyu Nugroho, Rahma Ramadhani, Titin Sundari
1-9
PDF (Bahasa Indonesia)
ANALISIS PENJADWALAN WAKTU TERHADAP BIAYA MENGGUNAKAN METODE LINE OF BALANCE (LoB) PADA PROYEK PENINGKATAN JALAN RIGID TALUN-SUMBERWANGI KAB. BOJONEGORO
Rojikin Roji, Totok Yulianto, Rahma Ramadhani, Titin Sundari, Meriana Wahyu Nugroho
10-21
PDF (Bahasa Indonesia)
Upper Structure Planning for the Hasyim Asy'ari University Rectorate Building Construction Project using a special moment-bearing frame system method.
Upper structure planning
Aldi firmansyah Wiyono, Totok Yulianto, Titin Sundari, Meriana Wahyu Nugroho
22-28
PDF (Bahasa Indonesia)
ANALISIS PENJADWALAN WAKTU TERHADAP BIAYA MENGGUNAKAN METODE LINE OF BALANCE PADA PROYEK PENINGKATAN JALAN RIGID MOJOAGUNG-MOJODUWUR KABUPATEN JOMBANG
penjadwalan ulang waktu dan biaya
Victor Kharisma Karuan, Totok Yulianto, Meriana Wahyu Nugroho, Titin Sundari
29-37
PDF (Bahasa Indonesia)
EVALUASI WAKTU DAN BIAYA MENGGUNAKAN METODE EARNED VALUE PADA PROYEK KONSTRUKSI (Studi kasus : Proyek Rehabilitasi Gedung Puskesmas Blimbing Kesamben)
Ade Kurniawan, Meriana Wahyu Nugroho, Titin Sundari, Totok Yulianto
38-47
PDF (Bahasa Indonesia)
ANALISIS KEKUATAN STRUKTUR BAJA KANTILEVER PADA FASAD GEDUNG REKTORAT UNIVERSITAS HASYIM ASY’ARI MENGGUNAKAN METODE LOAD AND RESISTANCE FACTOR DESIGN
Muhammad Rafi Nur Pangestu Nur Wakhid, Meriana Wahyu Nugroho, Totok, Titin Sundari
48-54
PDF (Bahasa Indonesia)
EVALUASI PENJADWALAN DENGAN METODE PDM (PRECEDENCE DIAGRAM METHOD) PADA PEMBANGUNAN WARE HOUSE PT SANDANG DUNIATEX MULTI INDUSTRI
Ahmad Risky Ardy Ansah Nunung Yuliani, Totok Yulianto, Meriana Wahyu Nugroho, Titin Sundari
55-61
PDF (Bahasa Indonesia)
IMPLEMENTASI BUILDING INFORMATION MODELING 4D SEBAGAI PROJECT CONTROL PEMBANGUNAN GEDUNG 3 LANTAI
nanang yatijo, Totok Yulianto, Meriana Wahyu Nugroho, Titin Sundari
62-68
PDF (Bahasa Indonesia)
ANALISIS KINERJA BIAYA DAN WAKTU MENGGUNAKAN METODE EARNED VALUE PADA PROYEK PEMBANGUNAN JALAN AKSES PELABUHAN UJUNG JABUNG JAMBI
AVIV HISYAM RAMADHAN, Totok Yulianto, Titin Sundari, Meriana Wahyu Nugroho
68-77
PDF (Bahasa Indonesia)
ANALISIS BEBAN GEMPA PADA STRUKTUR GEDUNG LOBBY BARAT RSUD dr. ISKAK TULUNGAGUNG MENGGUNAKAN METODE DINAMIK RESPONSPEKTRUM
Rizqi Arifin Aurora muntoyah, Titin Sundari, Totok Yulianto, Meriana
78-85
PDF (Bahasa Indonesia)
PERENCANAAN DAYA DUKUNG PONDASI MINI PILE PADA PEMBANGUNAN GEDUNG REKTORAT UNIVERSITAS HASYIM ASY’ARI MENGGUNAKAN METODE MAYERHOFF
Misbahun Nurfan Jaufi Muhammad Yusuf Wfendi, Titin Sundari, Totok Yulianto, Meriana Wahyu Nugroho
86-93
PDF (Bahasa Indonesia)
EVALUASI KEMAJUAN PROYEK DENGAN METODE NILAI HASIL
(Studi Kasus :Pelaksanaan Pembangunan Gedung Puskesmas Mojoagung Kab. Jombang)
Mohammad Faris Baha'uddin, Totok, Meriana Wahyu Nugroho, Titin Sundari
94-101
PDF (Bahasa Indonesia)
Current Issue
flag