PENGUKURAN EARNED VALUE ANALYSIS SEBAGAI EARLY WARNING SIGNS PADA PROYEK KONSTRUKSI

Authors

  • A'izzatul Khiyana Universitas Hasyim Asy'ari Tebuireng
  • Titin Sundari Universitas Hasyim Asy'ari Tebuireng
  • Totok Yulianto Universitas Hasyim Asy'ari Tebuireng
  • Meriana Wahyu Nugroho Universitas Hasyim Asy'ari Tebuireng
  • Achmad Imam Agung Universitas Negeri Surabaya

Keywords:

earned value analysis, time, cost

Abstract

The basic concepts of earned value analysis can be utilised to evaluate performance and forecast the achievement of objectives, particularly in relation to cost and time. Systematic cost and time control is essential to ensure that the project execution time is in accordance with the contract, or even faster, so that costs can be minimised to avoid sanctions due to delays. The objective of this study is to evaluate time and cost performance using the calculated earned value analysis method and analyse the causes of delays and cost overruns. The method applied in this research is Earned Value method, with data of S-Curve, Budget Plan of Cost (RAB), project weekly report, and actual cost. The results showed that the project was delayed by 2 weeks, bringing the total completion time to 25 weeks. The main cause of the delay was caused by changes in the scope of work during implementation, while cost overruns occurred due to work that was not in accordance with the predetermined schedule.

Downloads

Download data is not yet available.

References

Salmah, E., Harsono, I., Ismiwati, B., Wijimulawiani, B.S., Handayani, T., 2024. Determinan Permintaan Perumahan di Kota Mataram. Jurnal Ekonomi Pembangunan, 6(1) , pp. 79–88.

Billah, T. A., Abdullah. & Bulba, A.T., 2023. Analisis Faktor-Faktor yang Mempengaruhi Triple Constraints Proyek Konstruksi Gedung di Provinsi Aceh dalam Masa Pandemi Covid 19. Teras Jurnal, 13(1), pp. 99–112.

Janizar, S., 2023. Penerapan Metode Earned Value Analysis terhadap Waktu Penjadwalan ( Studi Kasus : Pembangunan Gedung Ruang Kelas Baru ( RKB ) pada Madrasah Aliyah Negeri (MAN) Kab. Karawang. Jurnal Konstruksi, 21(1), pp. 113–120.

Tangtobing, R. F. F. & Waty, M., 2023. Penerapan Metode Earned Value Dan Earned Schedule Pelaksanaan Proyek Rumah Sakit X di Bandung. JMTS:Jurnal Mitra Teknik Sipil, 6(2), pp. 237–248.

Setiyono., Hajji, A. M., Larasati, A. & Alfianto, I., 2024. Simulasi Progres Proyek Konstruksi Time Performance Menggunakan Earned Value Management dengan Integrasi Artificial Neural Network. Jurnal Teoritis dan Terapan Bidang Rekayasa Sipil, 12(1), pp. 37–48.

Sentana, H. S., Suksmono, A. K., Sari, C. A. N., 2024. Evaluasi Waktu dan Biaya Menggunakan Earned Value Method ( EVM ) pada Gedung Mal Pelayanan Publik (MPP) Kota Tegal. Jurnal Teknik Sipil dan Bangunan, 2(1), pp. 13–19.

Wicaksono, A. A. & Tisnawati., 2023. Analisis Earned Value pada Proyek Pembangunan Gedung Kantor Polsek Kedungwuni Kabupaten Pekalongan Jawa Tengah. Jurnal Teknik Sipil, 9(2), pp. 127–137.

Moerdiwanto, M. F. & Zuhdy, A.Y., 2023. Analisa Perhitungan Waktu dan Biaya pada Proyek Pembangunan Gedung DPRD Balai Pemuda Surabaya dengan Metode Earned Value Management. Jurnal Teknik ITS, 12(1).

Dwiantoro, D., Yoansa, A.Y. & Indrayana, D. V., 2024. Analisis Faktor Penyebab Keterlambatan Proyek “XYZ”. Jurnal Talenta Sipil, 7(1), 388-403. .

Shofiyah, Q. & Pambudi, E.P., 2024. Implementasi Metode House of Risk pada Identifikasi Faktor Penyebab Keterlambatan Proyek Pembangunan Gedung Research Center UPNV Jawa Timur. Publikasi Riset Orientasi Teknik Sipil (Proteksi), 6(1), 73-80.

Rita, E., Carlo, N. & Nandi., 2021. Penyebab Dan Dampak Keterlambatan Pekerjaan Jalan Di Sumatera Barat Indonesia. Jurnal REKAYASA, 11(1), 27-37..

Limantoro, C., Andi. & Rahardjo, J., 2023. Analisa Faktor Cost Overruns dengan Metode Interpretive Structural Modeling pada Proyek Konstruksi di Indonesia. Dimensi Utama Teknik Sipil, 10(1), 20-37.

Downloads

Published

2024-12-16

How to Cite

Khiyana, A., Sundari, T., Yulianto, T., Nugroho, M. W., & Agung, A. I. (2024). PENGUKURAN EARNED VALUE ANALYSIS SEBAGAI EARLY WARNING SIGNS PADA PROYEK KONSTRUKSI. Prosiding Seminar Nasional Sains, Teknologi, Ekonomi, Pendidikan Dan Keagamaan (SAINSTEKNOPAK), 8, 13–20. Retrieved from https://ejournal.unhasy.ac.id/index.php/SAINSTEKNOPAK/article/view/7563