MONITORING PELAKSANAAN PROYEK REVITALISASI RUANG PAVILIUN RUMAH SAKIT UMUM Dr. SOEROTO NGAWI DENGAN METODE NILAI HASIL
DOI:
https://doi.org/10.33752/reaktom.v1i2.51Abstract
Every construction project certainly has constraint and barrier, to limit every constraint occurs in project conduction then it needs supervision or monitoring in carrying out of building activity. This research uses value result method to determine the time needed to finish and cost needed up to the finishing project. Here, there are there are three indicators attentioned in using result value method, they are BCWS, BCWP, and ACWP. The monitoring result from result value method calculation is that the estimation of the last finishing job are 123 days three days late from the normal is that 120 days in finishing. Whereas the cost spends up to the finishing job is estimated Rp. 612.512.649,00 lower than the cost determined, and it can be guess that the company get profits.
Key words: project monitoring, result value methode, time, and cost.
Downloads
Downloads
How to Cite
Issue
Section
License
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgment of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgment of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).